As you can see time has marched on and Kevin's bike has progressed to the next stage, he has started making a seat and tank for the now completed frame. He has also bought a turbo and decided where to mount it. He is still waiting for work to commence on the barrels, four valve head and rocker box.

In the meantime he will use the craft wood mock ups to make all the plumbing for the turbocharger and fuel injection.

Kev has also made some adjustable rearsets and mounted them on the frame so he can try it for size. Although it seems to be taking forever to build just remember what it is Kevin is trying to achieve here, this is a monumental task and will be well worth the wait.

Update (11/11/06)

I called in to see Kevin yesterday to say g'day and check on his progress. As usual he had something to show me, this time it was his alloy billet barrels and sleeves and his new discs from an FZR1000 Yamaha.

As you can see he still has a way to go with the barrels with lots of work to be done on his milling machine cutting all the fins. The sleeves are aluminium alloy (T60 something) and will be Nicosil coated when finished. This should dissipate heat better than the stock barrels and be best for the turbo'd motor.

Kevin chose the FZR1000 discs because as you can see the bolt pattern is the same as the XS front hub and it is a better and more modern floating type disc. There will two of them on the front ant another on the back, should stop alright!

Only one fitted to the bike so far for mockup and it will have some new billet calipers as well.

I forgot to mention earlier that the port design for the four valve head has been modelled on the Mitsubishi Evo head, this is a proven turbo engine with many wins in racing around the world and should work extremely well on this motor. Kevin has also ordered a set of Ivan's high ratio primary gears for this motor. Electronics will be handled by a Motec M4 ECU and should be more than capable of doing what is needed to make this a first class performance machine capable of speeds previously unheard of for an XS650 based bike. Maybe a world speed record is a possibility for a vertical twin and by one of our members, now there's a thought. Move over Burt Munro!

27/12/06

I called in to see Kevin over Christmas and check out his progress, I wanted to use his TIG welder as well, and he was busy milling some fins on his billet barrels.

It's a big job and will take weeks of work but they will look fantastic when he's finished

All the fins are now cut, just the final shaping to go.

The exhaust has been started, note pipes for outlet and wastegate.

Update 26/5/07

Here is the finished barrels complete with Alloy cylinder liners ready to be bored to size and nickasil coated.

They look pretty spectacular don't they, cant wait to see the 4-valve head when it's finished.

Kevin Palmer and Ivan Hoey  have been putting their heads together about a possible venture to Lake Gairdner (Australia's Bonneville) with their bikes to see if they can secure a speed record with their XS's. It would be quite an achievement if we had two record holders in the club now wouldn't it. (Look out Burt Munro)

30/10/07

Today I paid Kevin another visit to catch up on what he's been doing and took a few more pics so you can all have a look.

He now has plans to build his own six speed gearbox for his bike and has already been experimenting with mild steel mock-ups to see if it will all go together as planned.

During the week he also took delivery of his pistons for the bike from Ross pistons in the USA. These have been anodized and Teflon coated as well as having the crowns ceramic coated, all necessary stuff if they are to live in a turbocharged motor.

He has also been busy making small parts for the bike, like cam chain adjusters and intercoolers and plenum chambers, you know the kind of stuff we all mess about with in our sheds (yeah right)

Here's the intercooler and blow off valve. A small electric pump will circulate water through a remotely mounted radiator under the seat to the bearing housing on the turbo and the intercooler to keep it all cool.

Kevin has also modified the rear swing arm with axle adjuster blocks welded on for extra length, this may very well be necessary to keep the front end down under boost!!!

Here you can see the output pipe from the turbocharger bending to where the intercooler will be mounted.

A plenum chamber will bolt onto the throttle bodies of the fuel injection and the output from the intercooler will feed into the plenum chamber, the blow off valve location is yet to be decided but will be somewhere on the inlet side of the intercooler and will be vented to the atmosphere.

9/1/08

Intercooler and Plenum chamber now finished. This is roughly how they will be situated under the tank and seat. Plenum chamber was hand formed by kev and took a lot of effort and time to get it just right. There is still a few items to fit in there like fuel pump and pressure regulator and pop off valve, also a radiator and pump for the water to cool the intercooler and turbo bearing housing and battery and engine management system. A bit of a nightmare there Kev but I'm sure you'll work it all out.

Kev has just bought a new set of front forks for the beast, '07 Yamaha R1 with six piston calipers, these forks are adjustable for compression and rebound and anything else that might need adjusting!

Update (2/4/08)

 I visited Kev's place today and he has been busy making the hubs for his bike, check these out!

Here is the front hub

and here is the rear.

Take it from me the pictures do not do them justice, they are beautiful. I can't wait to see them laced up to the polished alloy rims he has bought, the rims are away being polished as we speak.

I called into Kev's today and took a few more shots. He has just finished lacing up the back wheel.

Sorry for the not so good pics, I forgot my camera and had to use the phone.

Update 29/7/08

Kevin has now decided to build a high output permanent magnet alternator. This is because the stock alternator is too feeble to supply the many electrical components that will be fitted to Kev's bike. he will need about 400w capacity to run the fuel pump and water pump to circulate water through his intercooler and turbo bearing housing as well as everything else normally powered by electricity on a bike.

What Kevin has done is to pull the guts out of a Holden alternator and open up the stock alternator housing so the stator windings from the car alternator will fit inside. His next step was to make his own permanent magnet rotor.

Kevin has used rare earth magnets which are extremely strong, believe me, you don't want to get your finger between these babies when they get attracted to each other. Anyway, as you see from the pic Kevin has done his usual job on making this rotor.
The rotor was designed to be the same diameter and segment spacing as the original car rotor and the magnets have been placed in an alternating north then south pole configuration to produce an alternating current (AC) three phase output.

The outside of the rotor will be used to mount the chopper plates for the fuel injection and ignition and all this fits behind the stock cover! 

This set-up should pump out 35 Amps all day so Kev is using a high amp regulator with thermal protection for a Harley.

Kev has also been busy re-polishing his rims and hubs after drilling and assembly to make sure all is well. They got some small scratches during the process so now need to be re-polished and finally assembled.

Kev has also had his blank gears for his six speed gearbox internally splined so now he can go ahead and cut them.

Front wheel all polished and laced up and fitted to the R1 front end.

New triple trees to suit the R1 front forks.

Kevin has been making some spacers for his front and back wheels

Here's a pic of his trick clutch pressure plate with centrifical force assistance.

Kev's latest job is to start making his six speed gearbox.

Here's the blank gear setup in the milling machine between the dividing head and live centre ready for cutting.

One down eleven to go.

Kevin has also nearly finished the muffler for the turbo, should flow ok!

A bit of a tight squeeze under the seat but the intercooler and plenum chamber fit up to the throttle bodies ok.

There's a blow off valve under there too some where but it's hard to see from this angle.

Update 4/4/09

Kev has been busy for while now making gears for his gearbox but managed to find some time to get his wheels laced up for the final time and have some tyres fitted.